Integration & Support

Aircraft endurance. A scoped integration program.

We integrate the power system against your aircraft and define the evidence and support scope by agreement. The aircraft design authority retains ultimate authority.

We do not build or sell competing airframes.

Integration Test Bed — internal demonstrator →

The integration process

01

Requirements

Agree the mission, aircraft interface, installation envelope, operating environment and qualification authority through a secure technical exchange.

02

Configuration

Select stack, balance of plant, cooling, storage and hybrid battery against the aircraft requirements. Technology partner data (unverified by H2ES) is clearly separated from our own evidence.

03

Evaluation

Generate configuration-specific bench and integration evidence against agreed test levels. Qualification and certification are not assumed.

04

Deployment planning

Review hydrogen supply, spares, procedures and support before fielding. Availability and responsibility are confirmed by agreement.

Who owns what

One endurance-system control and safety owner. The aircraft design authority retains ultimate authority.

H2ES proposed scope

  • Endurance power system architecture and its aircraft interface
  • Hybrid power-management controls
  • Thermal, ventilation and exhaust requirements and system-side design
  • Hydrogen detection and emergency shutdown
  • Qualification evidence and configuration control for the power system
  • System acceptance and fleet readiness support

Your team retains

  • Aircraft performance requirements
  • Payload and mission architecture
  • Flight-control authority
  • Airframe structural approval
  • Final airworthiness decision
  • Operational command and CONOPS

The split is a starting point, not a contract. Design authority on every line is confirmed with your chief engineer before hardware is committed. Installed aviation use of a certified cylinder can still require program-specific safety substantiation.

Supply Chain & Compliance

Supplier names available under NDA.

No compliance determination is published until the relevant configuration has been assessed.

How we work commercially

Prices by quotation. Deliverables and responsibilities are agreed before each stage begins.

01

Mission-fit assessment

You receive a mission-fit decision, preliminary architecture and proposed program scope.

02

Integration & qualification program

NRE, scoped per platform. You receive the agreed integrated power-system configuration and an evidence package with interfaces, limitations and configuration control.

03

Production & fleet support

Per-unit systems, spares, hydrogen supply and logistics, and readiness support as scoped by agreement. Supply capability and service arrangements require confirmation; no existing network is implied.

Start with the aircraft mission.

Start a mission-fit assessment

All figures are preliminary and subject to application review — see Terms of Use.